What to Expect During a Roof Replacement: A Step-by-Step Guide
New Title

Replacing your roof is a big investment—but it’s also one of the most important upgrades you can make to protect your home. Whether your current roof has reached the end of its lifespan, suffered storm damage, or you're just ready for an upgrade, understanding the process can help you feel confident every step of the way. At Quality Services Roofing, we've been replacing roofs in Ocala, Florida, for over 25 years. Here’s a step-by-step guide to help you know exactly what to expect during a roof replacement.
Step 1: Roof Inspection & Estimate
The first step is a professional roof inspection to assess the condition of your existing roof and determine what needs to be done.
What happens:
- We inspect for leaks, soft spots, damaged shingles, and any underlying structural issues.
- We provide a detailed written estimate outlining the work needed, the materials used, and a projected timeline and cost.
Tip: Ask questions about the estimate—your roofing contractor should walk you through it clearly.
Step 2: Choose Your Roofing Materials
Once you decide to move forward, it’s time to pick your new roofing materials. We’ll help you choose the right fit based on your home’s design, your budget, and Florida’s weather.
Common choices include:
- Asphalt shingles – Affordable and durable
- Metal roofing – Long-lasting and energy-efficient

Step 3: Scheduling & Permits
Before any work begins, we schedule your installation and take care of any permits required by your city or county.
You can expect:
- A clear timeline for the project.
- Notification of start date and expected completion.
- Our team handling all permits and local compliance requirements.
Step 4: Preparing Your Property
On installation day, we’ll prepare your home and yard to keep things safe and clean.
This includes:
- Laying down tarps to protect landscaping.
- Moving patio furniture, grills, and vehicles out of the work zone.
- Letting you know what areas to avoid for safety.
Step 5: Old Roof Removal
We remove your existing roof down to the decking (the wooden surface underneath the shingles).
Why it matters:
- This step allows us to check for hidden damage or wood rot.
- We replace or repair damaged decking before installing your new roof.
Step 6: Installation of the New Roof
Now comes the exciting part—your new roof goes on!
This process includes:
- Installing underlayment (a waterproof barrier).
- Installing flashing around chimneys, vents, and skylights.
- Applying the new roofing material layer by layer.
- Ensuring proper ventilation and sealing.
Timeline:
Most roof replacements take 1–3 days, depending on the size of your roof and weather conditions.
Step 7: Cleanup & Final Inspection
Once installation is complete, we take care of the cleanup and walk through the final inspection with you.
You can expect:
- All debris, nails, and materials cleaned from your yard.
- A magnetic sweep to pick up any stray nails.
- A final inspection to ensure everything meets our quality standards.
Step 8: Warranty & Maintenance Tips
We’ll go over the manufacturer’s warranty and any workmanship guarantees that come with your new roof.
We’ll also provide:
- Maintenance tips to keep your roof in top shape.
- Recommendations for regular inspections—especially after major storms.
- Our contact info in case you have questions down the road.
Final Thoughts
A roof replacement doesn’t have to be stressful. When you work with a trusted, experienced roofing company like Quality Services Roofing, we’ll walk you through the process from start to finish—clearly, professionally, and on time. If you're in Ocala or the surrounding areas and think it might be time for a new roof, give us a call or schedule a free inspection today.
Protect your home with a roof that’s built to last. Trust the team with 25+ years of roofing experience right here in Florida.